From demo to final walkthrough — one team, one timeline, NYC compliant

Full Gut Renovation

A Full Gut Renovation means we strip your space to the studs and rebuild it right — structure, plumbing, electric, HVAC, insulation, windows, floors, kitchens, baths, and final finishes. At Empire City Construction & Development Corp, we manage design coordination, DOB filings, condo/co-op approvals, inspections, and clean, on-schedule execution across all five boroughs.

Single Point of Contact

Dedicated PM, weekly updates, transparent budgets & schedules.

Licensed & Insured

DOB, LL11 coordination, COIs for management, safety compliance.

Quality & Warranty

Code-compliant builds, premium materials, clear closeout docs.

Scope of Work — What’s Included

Demolition, Framing & Structure

• Full interior demo, debris hauling & protection
• New partitions, headers, fire-blocking & sound insulation
• Leveling floors/walls • Window & door replacement

Plumbing, Electrical & HVAC (MEP)

• New risers/branches, fixtures & shut-offs • Gas (licensed)
• New service, panels, dedicated circuits & lighting plans
• Split systems/ductless, radiators, bath/kitchen ventilation

Building Envelope & Insulation

• Exterior repairs, waterproofing coordination, windows/doors
• Rockwool/spray foam, sound attenuation • Vapor barriers
• Energy-efficient assemblies to NYC standards

Kitchens, Baths, Floors & Finishes

• Custom kitchens, tile/stone work, shower pans & waterproofing
• Hardwood/LVP/porcelain — level, set, sand/stain/poly
• Paint, trim, closets, millwork, hardware & final punch-list

Our 9-Step Gut Renovation Process

1) Survey

Measure, scope, budget, timeline.

2) Design

Plans, elevations, selections.

3) Permits

DOB filings, board/COI approvals.

4) Demo

Protection, demolition, carting.

5) Framing

Structure, windows, insulation.

6) MEP Rough

Plumbing, electric, HVAC.

7) Inspections

DOB & progress sign-offs.

8) Finishes

Tile, kitchens, baths, floors, paint.

9) Handover

Punch-list, clean, closeout docs.

FAQs — Full Gut Renovations

How long does a full gut renovation take?

8–12 weeks. Larger multi-room or multiple baths/kitchen: 12–20+ weeks, depending on permits, inspections, lead-times and building rules.

Do you handle permits, boards, and COIs?

Yes. We prepare drawings with your designer/architect, file with DOB, coordinate condo/co-op approvals, and provide COIs to building management.

Can you work in occupied apartments?

We can phase work when feasible. We install floor protection, dust barriers, negative air, and keep strict quiet hours & daily clean-ups.

What’s included in your warranty?

Manufacturer warranties honored plus our workmanship warranty. We provide closeout docs, inspection records, and maintenance guidance.

Serving All Five Boroughs

Brooklyn • Bronx • Manhattan • Queens • Staten Island

Book a free site visit and detailed scope review.

Planning a Full Gut Renovation?